To building and apartment owners: Have you completed the comprehensive exterior wall inspection?
Prevent falling accidents of exterior wall tiles in advance with the cost-effective and time-efficient "rope access method"! Work is also possible in high and difficult locations where scaffolding installation is challenging.
In March 2022, due to amendments to the Building Standards Act, it became mandatory to conduct exterior wall inspections as part of the periodic inspections for specified buildings (every 1 to 3 years) and comprehensive surveys (every 10 years). Our company has partnered with SES Co., Ltd., which has extensive experience in exterior wall inspections and repair work. During large-scale renovation projects of buildings (1 to 15 floors) using "rope access methods," we conduct peeling and deterioration inspections of exterior finishes, develop repair plans, carry out repair work, and prepare reports. Since we can perform high-altitude work quickly using a full-body harness and two ropes without the need for temporary scaffolding, we can conduct exterior wall inspections and repairs even in places where "there is no space to set up scaffolding" or "a high-altitude work vehicle cannot be used." 【Benefits】 ■ No scaffolding required ■ Lower construction costs ■ Reduced construction time ■ High mobility; no restrictions on work locations *For more details, you can view immediately from [PDF Download].
- Company:ベンチャーマテリアル株式会社
- Price:Other